*****Is going there and back to see how far it is.*****













Hi I am Jo…wife, lover, best friend and soulmate to Keith. Lover of all things to do with nature and the canals. I am passionate about the Waterways and its history.


I hope you will join me in my rambles and do please comment – I love to hear from and meet new people in blogland!

Life on the cut through my eyes.

Daisypath Anniversary tickers
*****Stay safe and warm out there..*****













Monday 29 January 2018

It is done.

Hello Friends and Followers.

We have been busy in the railway room today. I am actually amazed at how well we have done with building this room ourselves. I am pretty useful with a power tool, but Keith is the one who is good with measurements and how things should fit together.
Yesterday we put up the first two lots of the ceiling, which was the tricky part because we had to work around the stand.
This morning it was full steam ahead with the next section and then we were left with one bit to do.
By lunchtime we just had the one section to put in. So we stopped for lunch and a coffee.
In not time at all after lunch the final piece of the ceiling jigsaw was in place. It was then the big tidy up ready for the next stage of the big build which is the bulkhead against the mast. We both tidied and hoovered to get rid of the mess we had made, so tomorrow we will have a nice clear space to begin the bulkhead.

Pop back soon x

No comments:

Post a Comment

I am sorry but I DO NOT publish ANONYMOUS comments, nice ones or otherwise, so if you want your comment posted please leave your name when posting. I will not post SPAM or advertising for products either. I will then do my best to reply. Thank you for leaving me a message.

LinkWithin

Related Posts with Thumbnails